Page 32 - 372.w
P. 32

Mass Patient Care


                       1  Adapt generic mass patient-care strategy  4  Ensure that system is fully in place for
                           to specific event within 60 minutes of
                                                                       restocking supplies throughout duration
                           notification.                               of site activation.


                       2   Staff mass care site(s) with adequate and  5  Ensure that system is fully in place for
                                                                       rotating and/or relieving staff throughout
                           appropriate personnel (including volun-
                           teer surge staff) prior to site opening.    duration of site activation.


                       3   Identify and request any just-in-time   6   Prepare and deliver all required record-
                           training needs (including use of PPE) at
                                                                       keeping supplies to site coordinator prior
                           least 2 hours prior to site opening.        to site opening.





                        Mass Fatality Management

                       1   Identify suitable facility (if needed) prior  2  Develop plan for transporting bodies
                                                                       (including routes and expected time
                           to dispatching pickup vehicles.
                                                                       frames) prior to dispatching pickup
                                                                       vehicles.



                        Environmental Surety

                       1   Develop/adapt strategy for control of   3   Establish PPE criteria for staff.
                           environment rendered hazardous by the
                           event within 30 minutes of site identifi-
                           cation.


                       2   Identify specific characteristics of affected
                           areas and report to IC within 30 minutes
                           of arrival on site.

























          30
   27   28   29   30   31   32   33   34   35   36   37